68 St Overlay (50 Ave to CP Tracks)

Rehabilitation of 68 St from 50 Ave to CPR Tracks. As a result of a the Tetra Tech report from 2015, a number of locations along 68 St/ Camrose Dr were identified as needing rehabilitation.

Schedule Contractor
Completed - June 2016 Border Paving Ltd.